What our Kalkallo inspections find, stage by stage

Across the Kalkallo jobs we have inspected, the same handful of items keep coming back at each stage. None are exotic. They are the things that get missed when trades move fast across a new estate, and they are cheap to fix only while they are still visible.

At the slab

Extra top bars from the engineering not yet installed, cover short where steel touches the forms, too few bar chairs, loose pods and uncapped pipes and bar ends.

At the frame

Bracing walls on the plan not braced, trusses resting on non-load-bearing walls, bottom plates overhanging the slab by more than 10mm and plates cut through in bracing walls.

At lock-up

Bracing cut by service trades, cables touching gas or hot water pipes, crimped ducts and brickwork sitting past the slab edge.

At handover

Weep holes too low or blocked, unsealed expansion joints and penetrations, broken roof tiles, missing isolation joints and doors that will not latch.

On resales

Settlement cracks, sticking doors, mould at sills, insulation against downlights and an unstable boundary fence.

More about Kalkallo

Written by our local inspection team from work carried out in Kalkallo. Licensed building practitioners, Building & Plumbing Commission registration CDB-U 53425.

Guides

Guides for Kalkallo owners and buyers

All guides →

Book a building inspection in Kalkallo

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

What our Kalkallo inspections find, stage by stage: common questions

What is the most common slab finding in Kalkallo?

Steel short of the drawings or sitting with too little cover.

What do frame inspections find here?

Missing bracing and trusses bearing on internal walls that are not load bearing.

What fails most at handover?

Water details at the base of the wall, such as weep holes and unsealed joints.

Are these serious?

Some are structural and some are finishing items. The report says which is which.

Does every house have these defects?

No, but enough do that each stage is worth checking.