Lock-up (pre-plaster) inspection in Kalkallo

Windows, doors, roof and brickwork are on, the walls are still open, and every service runs where you can see it.

  • Roof, windows and brickwork done, before plaster
  • 1 to 2 hours on site
  • Report within 24 hours
Request your quotePick the inspection and leave your number. We ring back the same working day.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage4 of 7
When to bookRoof, windows and brickwork done, before plaster
Time on site1 to 2 hours on site
Inspected againstAS 3700 (masonry), AS 4773, AS 2047 (windows), NCC Part 3.5 roof and wall cladding, manufacturer flashing details

What is included in a Kalkallo lock-up (pre-plaster) inspection

  • Bracing intact after services
  • Cable clearance to gas pipes
  • Cable clearance to hot water pipes
  • Gas and cold water pipes separated
  • Ducts supported without crimps
  • Window and door flashings seated
  • Brick overhang at the slab edge
  • Weep holes and cavity clear
  • Sarking under the roof covering
  • Noggings for bath, garage and fittings
  • Service penetrations sealed
  • Downpipes connected to stormwater
  • Outstanding frame items
  • Termite management notice in place
Why it matters here

Lock-up (pre-plaster) inspections on Kalkallo builds

At lock-up in Kalkallo we regularly find bracing cut by trades running services, cables lying on gas or hot water pipes, crimped ducts in the roof and brickwork sitting past the slab edge. Plaster hides all of it within days.

What we find at this stage in Kalkallo

  • Bracing cut by later trades
  • Cables touching gas or hot water pipes
  • Ducts crimped or poorly hung
  • Brickwork overhanging the slab edge
  • Window flashings not seated
  • Downpipes not yet connected to stormwater
Noggings missing around the bath hob where the plaster needs edge support, Kalkallo
Noggings missing around the bath hob where the plaster needs edge support
Window rubber flashing not sitting properly between the frame and brickwork, Kalkallo
Window rubber flashing not sitting properly between the frame and brickwork
Downpipes up but not yet connected to the underground stormwater system, Kalkallo
Downpipes up but not yet connected to the underground stormwater system
Sample findings

Sample defects found during our lock-up (pre-plaster) inspections in Kalkallo

Annotated findings from Lock-up (pre-plaster) inspections.

Structural bracing cut through beside the pantry, weakening resistance to wind load, found during a lock-up inspection in Kalkallo
Structural bracing cut through beside the pantry, weakening resistance to wind load
Electrical cables touching gas pipes where a 25mm separation is required, found during a lock-up inspection in Kalkallo
Electrical cables touching gas pipes where a 25mm separation is required
Heating and cooling ducts crimped by tight bends and poor support in the roof, found during a lock-up inspection in Kalkallo
Heating and cooling ducts crimped by tight bends and poor support in the roof
Bottom brick course projecting past the slab edge by more than 15mm, found during a lock-up inspection in Kalkallo
Bottom brick course projecting past the slab edge by more than 15mm

The other stages of a Kalkallo build

  1. Bored piers inspection in Kalkallo1Bored piersWhile the holes are open, before concrete arrives
  2. Slab pre-pour inspection in Kalkallo2Slab pre-pourThe day before concrete, steel and pods all in
  3. Frame inspection in Kalkallo3FrameTrusses fixed, before wrap and roof covering
  4. Fixing inspection in Kalkallo5FixingPlaster, doors and cabinets fitted, before paint
  5. Waterproofing inspection in Kalkallo6WaterproofingMembrane cured, before the tiler starts
  6. Pre-handover (PCI) inspection in Kalkallo7Pre-handover (PCI)At practical completion, days before handover

All construction stage inspections in Kalkallo →

Guides

Construction stage guides for Kalkallo

All guides →

Book a lock-up (pre-plaster) inspection in Kalkallo

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Lock-up (pre-plaster) inspections in Kalkallo: common questions

What is the point of a lock-up inspection?

It is the last look inside the walls. Services, bracing, noggings and flashings are all checked before plaster covers them.

Do you check the electrical work?

We note visible clearance problems such as cables against pipes. We do not test or certify wiring; that is for a licensed electrician.

Why does cut bracing matter?

Bracing resists wind load on the house. A cut brace has to be repaired or replaced to the bracing design.

Are frame items checked again?

Yes. Anything from the frame report that is still open is listed again.

What standards apply at lock-up?

AS 1684, AS 4773 for masonry, the National Construction Code and the Guide to Standards and Tolerances 2015.

How long does it take?

Around one and a half to two hours on a typical double storey home.