In short: Weep holes let the brick cavity drain and breathe. They need clearance above the ground and must be free of mortar, or water and termites have an easy way in.

What weep holes do

They let water that gets behind brickwork drain out, and let the cavity ventilate. Blocked or buried weeps trap moisture against the frame.

The clearance rule

The bottom of a weep hole should be at least 150mm above the adjacent ground, or 75mm on graded sites. Paths and garden beds poured or built too high break this.

Blocked with mortar

Mortar and render dropped into the weeps during construction is common. It needs raking out before handover.

Fix it before keys

Lowering ground or adjusting paths is the builder's job at handover, and much harder to get done later.

Written by our local inspection team from work carried out in Kalkallo. Licensed building practitioners, Building & Plumbing Commission registration CDB-U 53425.

Guides

More pci / handover guides for Kalkallo

All guides →

Book a building inspection in Kalkallo

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Questions Kalkallo owners ask about this

Why does weep height matter for termites?

Low weeps can give termites hidden entry through the cavity.

Can I fix blocked weeps myself?

You can rake them out, but at handover it is the builder's job.

Is this in the Guide to Standards and Tolerances?

The clearance comes from the building requirements; the report cites the relevant clause.

What about landscaping later?

Keep beds and paving below the weeps when you landscape.